Sectors

Eight sectors. Onesizing engine.

Construction is where Sizr was built, and it is still where most of the work is. These are the other UK sectors that live on temporary power, and what changes about the sizing when you walk onto each one.

01Sector

Construction

Most UK sites run on temporary power for months before a permanent supply is energised. Welfare cabins, tower cranes, hoists, task lighting and 110V tools all sit behind the same set, and they rarely peak politely one at a time.

Load personality

  • /The 7am welfare surge as heaters, kettles and dryers land together
  • /Crane and hoist starting current, not just running current
  • /Overnight standby that keeps a set idling at low load
  • /Load that grows through the programme as trades arrive

Typical Sizr output

  • /Stage V generator sized on peak, not average
  • /Hybrid battery to carry nights and shave the morning peak
  • /Powerlock or lug tails to the main distribution unit
  • /Splitter boxes, 63A and 32A distribution, 110V transformers

Sizing on the sum of nameplate ratings buys a set that spends its life at 20 percent load, burning fuel and glazing bores. Sizr applies diversity and duty cycles instead.

Construction temporary power on a UK site
02Sector

Rail, highways and civils

Linear projects move. A rail possession, a highways contraflow or a bridge replacement puts a working compound somewhere with no supply at all, often for a single weekend, then does it again three miles down the track.

Load personality

  • /Short, intense possession windows with a hard handback time
  • /Lighting towers, welfare and signalling test gear on one compound
  • /Split compounds along a route rather than one central load
  • /Noise limits where works sit against housing

Typical Sizr output

  • /Compact towable sets that fit the compound and the access
  • /Battery led supply for quiet running through the night
  • /Long cable runs with voltage drop accounted for
  • /Duplicate distribution so a swap does not stop the works

Because possessions are priced by the hour, an undersized set is not an inconvenience, it is a missed handback. Sizr shows the headroom it has left you and why.

Rail, highways and civils temporary power on a UK site
03Sector

Events and festivals

Event power is the most peaked load in the country. A field is empty on Wednesday, drawing hundreds of kVA across stages, traders, bars and broadcast by Friday night, then quiet again by Monday morning.

Load personality

  • /Show peaks against a very low overnight base load
  • /Trader villages with heavy catering and refrigeration demand
  • /Sound and lighting that will not tolerate voltage dips
  • /Redundancy expectations for anything life safety related

Typical Sizr output

  • /N plus one arrangements for critical stages
  • /Battery storage to hold the overnight base load with sets off
  • /Ring or radial distribution across the site with cable schedules
  • /Metered distribution for trader recharging

The overnight base load is where events waste the most fuel. Model it properly and a battery removes the need to idle a large set all night.

Events and festivals temporary power on a UK site
04Sector

Data centres and critical load

Data centre programmes need temporary power at both ends: to build and commission the hall, and to bridge cooling, controls and critical load during upgrades or a delayed grid connection.

Load personality

  • /Load bank testing to prove capacity before handover
  • /Cooling and controls that cannot see an interruption
  • /Step loads during commissioning and witness testing
  • /Long duration running with tight fuel management

Typical Sizr output

  • /Sets sized with margin for step load and harmonic content
  • /Load banks matched to the test regime
  • /Bulk fuel with monitored autonomy
  • /Fully documented distribution and changeover arrangements

This sector buys certainty rather than kilovolt amperes. Sizr prints every assumption so the temporary arrangement can be reviewed and signed off.

Data centres and critical load temporary power on a UK site
05Sector

Utilities and grid works

Water, wastewater, gas and electricity networks run temporary power whenever an asset is taken out of service. Pumps, blowers, dosing and telemetry still have to run while the substation or the pumping station is rebuilt.

Load personality

  • /Motor starting on pumps and blowers, repeatedly
  • /Continuous duty across an outage window measured in weeks
  • /Telemetry and control loads that must stay live
  • /Sites with difficult access and limited standing area

Typical Sizr output

  • /Sets sized on starting current with soft start where fitted
  • /Bunded fuel storage for extended autonomy
  • /Automatic changeover between prime and standby
  • /Cable and distribution to scattered assets on one site

Continuous duty at part load is where fuel spend hides. A 24 hour model, rather than a working day model, is the only honest way to price it.

Utilities and grid works temporary power on a UK site
06Sector

Industrial shutdowns

Manufacturing turnarounds compress a year of maintenance into a fortnight. Temporary supplies keep welding, lifting, testing and site lighting running while the plant supply is isolated.

Load personality

  • /Welding and test loads with poor power factor
  • /Round the clock working across shift patterns
  • /Hot work and lifting concentrated into short windows
  • /Areas isolated one by one rather than all at once

Typical Sizr output

  • /Sets sized for welding duty and power factor
  • /Temporary distribution zoned by work area
  • /Task lighting and welfare on separate circuits
  • /Standby capacity for the loads that cannot stop

Shutdown power is planned weeks ahead and changed days ahead. Being able to resize in minutes is worth more here than anywhere else.

Industrial shutdowns temporary power on a UK site
07Sector

Film, TV and broadcast

Location work carries lighting, camera, hair and makeup, production offices and honey wagons into places with no supply, and the whole lot has to be inaudible on a boom mic.

Load personality

  • /Lighting rigs with high inrush on strike and restrike
  • /Sensitive camera and audio equipment needing clean supply
  • /Unit base loads running long after the shoot day ends
  • /Strict noise limits, often in residential streets

Typical Sizr output

  • /Super silenced sets and battery units for takes
  • /Battery led supply so sets can be shut down while rolling
  • /Distribution to unit base, lighting and technical separately
  • /Cable runs planned around public access

Noise is the design constraint here, not capacity. Sizr models quiet hours against the real load so the battery is sized for the takes, not for a spreadsheet.

Film, TV and broadcast temporary power on a UK site
08Sector

Modular and healthcare

Modular buildings arrive complete and are occupied immediately. Heating, ventilation, IT and medical equipment all come on load together, often well before a permanent connection is available.

Load personality

  • /HVAC duty cycles across a full occupied day
  • /IT, comms and access control that must not drop
  • /Clinical equipment with its own continuity requirements
  • /Long hire durations measured in months or years

Typical Sizr output

  • /Sets sized for continuous occupied duty
  • /Battery storage for overnight and resilience
  • /Distribution matched to the building connection points
  • /Fuel and service planning across a long hire

Long hires reward accuracy. A single tier of oversizing carried for a year costs more than the whole sizing exercise ever will.

Modular and healthcare temporary power on a UK site
ConstructionRail and highwaysEvents and festivalsData centresUtilitiesIndustrial shutdownsFilm and broadcastModular and healthcareConstructionRail and highwaysEvents and festivalsData centresUtilitiesIndustrial shutdownsFilm and broadcastModular and healthcare

Not on the list

If it runs on agenerator, we size it.

Ports, agriculture, emergency response and defence all follow the same logic: a load with a shape, a duration and a noise limit. Tell us the profile you work with.